About Department
Balochistan Development Authority (B.D.A) was established in 1974 under Balochistan Act No. X of 1974, and works under the administrative control of Planning & Development Department Government of Balochistan. The following duties are assigned under the Act:
- to Promote Economic and Industrial Development in Balochistan.
- Preparation and execution of comprehensive development programs including projects and schemes relating to land and water development, power agriculture, industry, minerals exploration and development including establishment of minerals based industries and other industries andGovernment may direct along-with other duties to be assigned by the Government from time to time.
- The B.D.A. can sponsor companies with the approval of Government.
- The B.D.A. can participate in joint ventures with private sector.
- The B.D.A. can raise funds to carryout its functions by issuing Bonds and Debentures
- The B.D.A. can also borrow foreign currency from IBRD, Asian Bank or any other source under the above Act.
- Balochistan Development Authority (B.D.A) was established in 1974 under Balochistan Act No. X of 1974, and works under the administrative control of Planning & Development Department Government of Balochistan.
The following duties are assigned under the Act: to Promote Economic and Industrial Development in Balochistan. - Preparation and execution of comprehensive development programs including projects and schemes relating to land and water development, power agriculture, industry, minerals exploration and development including establishment of minerals based industries and other industries andGovernment may direct along-with other duties to be assigned by the Government from time to time.
- The B.D.A. can sponsor companies with the approval of Government.
- The B.D.A. can participate in joint ventures with private sector.
- The B.D.A. can raise funds to carryout its functions by issuing Bonds and Debentures.
- The B.D.A. can also borrow foreign currency from IBRD, Asian Bank or any other source under the above Act.
The B.D.A. is headed by a full time Chairman who is also Chairman of Board of Directors (BOD) assisted by Director, General Managers, Additional General Managers, Managers, XENs/ AGMs, Assistant Engineers, Architects/Town Planners, Sub- Engineers etc.
SUMMARY OF STAFF (Regular)
S.No. | Designation |
Grade/Scale
|
No. of Posts
|
1
|
Chairman |
21/20
|
1
|
2
|
Director |
20
|
1
|
3
|
General Managers |
19
|
4
|
4
|
Addl: General Managers |
18
|
3
|
5
|
Managers |
17
|
5
|
6
|
Secretary to Chairman |
17
|
1
|
7
|
Private Secretary |
16
|
1
|
8
|
Deputy Manager |
16
|
5
|
9
|
Computer Assistant |
11
|
2
|
10
|
Assistant |
11
|
2
|
11
|
Supervisor |
14
|
1
|
12
|
Transport Supervisor |
9
|
1
|
13
|
Senior Clerk |
7
|
5
|
14
|
Junior Clerk |
5
|
1
|
15
|
Mechanic |
5
|
1
|
16
|
Carpenter |
5
|
1
|
17
|
Plumber |
5
|
1
|
18
|
Driver |
4
|
11
|
19
|
Daftari |
3
|
2
|
20
|
Helper/Electrician |
2
|
1
|
21
|
Photo state Machine Operator |
2
|
1
|
22
|
Naib Qasid |
1
|
21
|
23
|
Chowkidar |
1
|
10
|
24
|
Guard |
1
|
1
|
25
|
Mali |
1
|
1
|
26
|
Sweeper |
1
|
2
|
Total |
86
|
Summary of Technical Staff
S.No
|
Designation |
No. of Posts
|
1
|
General Manager (Technical) |
1
|
2
|
General Manager (Civil Works) |
1
|
3
|
General Manager (Housing) |
1
|
4
|
Add: General Managers/XEN |
5
|
5
|
Project Director (Sewerage System) |
1
|
6
|
Assistant Engineer |
46
|
7
|
Material Engineer |
1
|
8
|
S.D.O. |
3
|
9
|
Geologist |
2
|
10
|
Senior Lab. Technician |
1
|
11
|
Architect |
1
|
12
|
Sub-Engineers |
51
|
13
|
Quantity Surveyor |
1
|
14
|
Surveyor |
1
|
15
|
Consultants for Survey, design and top supervision |
6
|
16
|
Drafts man/Quantity Surveyor |
1
|
17
|
Laboratory Technician |
2
|
Total |
125
|
SUMMARY OF EMPLOYEES Contract / Daily Wages
Head Quarter Regular Staff |
66
|
Project Staff Regular |
120
|
Engineers Civil Works |
48
|
Civil works Project Staff |
160
|
Daily Wages |
205
|
Total |
599
|
NON – DEVELOPMENT EXPENDITURE
Monthly Expenditure |
(RS. IN MILLION)
|
Monthly Salary |
4.60
|
Other Expenditure / Contingency per month |
0.50
|
TOTAL |
5.10
|
Annual Expenditure |
61.200
|
Balochistan Development Authority Location Map of Offices

Industrial Projects
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
Year of dis-investment
|
Amount of dis-investment |
1
|
Chiltan Ghee Mills Quetta |
Dec. 1975
|
14.00
|
Transferred to Ghee Corporation
|
1976
|
Known to GCP/ Privatization Commission
|
2
|
Automatic Bricks Plant Quetta. |
Aug. 1978
|
19.20
|
Disinvested/sold out
|
1995
|
20.500
|
3
|
Khudai Dad Glass Industries Quetta (J/V with private sector). |
1979
|
0.420
|
Liquidated. The JV partner was given the amount according to his share.
|
1987
|
Building land etc., with BDA.
|
4
|
Chiltan Feed Mills Quetta. |
1986
|
34.20
|
Disinvested/sold out
|
1994
|
14.500
|
5
|
Wool Spinning Plant Choto (Mastung). |
1986
|
29.88
|
Disinvested/sold out.
|
1995
|
5.00 Building & land with BDA
|
6
|
RCC Pipe Factory Quetta. |
Sep. 1990
|
27.15
|
Disinvested.
|
1998
|
13.000
|
7
|
Ginning Factory along with Expeller at Uthal. |
June 2006
|
41.228
|
Nearing completion
|
Groundwater Development
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
1
|
Bela Plain Groundwater Project (54 tubewells).
|
1985
|
67.98
|
Handed over to Beneficiaries/ Agriculture Department.
|
2
|
Nisai Groundwater (60 tubewells).
|
1988
|
51.30
|
Tubewells handed over to Beneficiaries/ Agriculture Department.
|
3
|
Drilled about 1000 tubewells for PHED, WASA, Irrigation, Afghan Refugees, WAPDA and other Departments.
|
1977-99
|
100.00
|
Handed Over to concerned Departments.
|
Water Supply Scheme
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
1
|
Gaddani Water Supply Scheme. |
1987
|
45.70
|
Handed over to PHED. |
2
|
Quetta Water Supply Scheme. |
1978
|
04.00
|
Handed over to PHED/Municipal Corporation. |
3
|
Afghan Refugees Water Supply Scheme (UNHCR). |
1980-84
|
19.61
|
Handed over to UNHCR. |
Mining & Mineral Based Industries (Mining)
S.No
|
Name of Scheme |
Year of Commencement
|
Cost
|
Remarks |
1
|
Fluorite Mining (Dilband Distt: Mastung). |
1978
|
03.70
|
Restarted. Supply of 2000 tons of Fluorite ore to CPC Dera Ghazi Khan.
|
2
|
Quartzite Mining, (Gajri Nai, Distt: Lasbella). |
1980
|
00.60
|
Closed as Pak Steel has stopped buying Quartzite from B.D.A.
|
Mineral Based Industries
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
Year of disinvestment
|
Amount of disinvestment
|
1
|
Balochistan Sulphur |
Feb.1986
|
03.47
|
Dis-invested/Privatized |
1994
|
1.103
|
2
|
Minchem Ltd. (Mineral based) chemical industry (Joint venture with Private Sector). |
1987
|
35.00
|
Dis-invested/Privatized |
1987
|
Bank investment
|
Civil Works
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
1
|
Construction of BDA Complex VIP Flats and Chief Justice House. |
1978
|
04.30
|
Under occupation by BDA Staff.
|
2
|
Grain Godowns at Chaman. |
Sep. 1978
|
01.30
|
Transferred to Food Department.
|
3
|
Shopping Centre & Flats. |
1978
|
01.10
|
(21 Shops & 20 flats ) Shops sold to private parties, Flats are with BDA & allotted to its employees.
|
4
|
Minister’s Bungalows at Quetta. |
1980
|
02.50
|
Handed over to S&GA Department.
|
Roads and Bridges
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
1
|
Samungli – Kanak Road. |
Nov. 1978
|
08.00
|
Completed & handed over to C&AW Department. |
2
|
Trunk Road for Gadani Ship-yard (25 KM). |
1983
|
14.75
|
Completed & Handed-over C&W Department. |
3
|
Construction of Wirahab Hanidan Bridges at Hub – Dureji Road. |
1995
|
36.380
|
Handedover to C&W Deptt. |
4
|
Wani Manda Bridge-I On Ziarat – Sinjavi Road. |
2000
|
14.119
|
Completed. |
5
|
Wani Manda Bridge-II on Ziarat-Sinjavi Road. |
1998
|
21.281
|
Completed. |
6
|
Ziarat – Sinjavi Road (32 Km). |
1998-2000
|
92.738
|
Completed & handed over to Government. |
7
|
Loralai – Sinjavi Road (32 Km). |
1998-2000
|
56.950
|
Completed & handed over to Government. |
8
|
Loralai – Marathangi Road (15 Km). |
1998-2000
|
35.948
|
Completed & handed over to Government. |
9
|
Killa Saifullah – Sharan Jogezai – Kanyara Road. |
1998-2000
|
9.000
|
Completed & handed over to Government |
10
|
Sangar – Musakhail – Khajoori Road. |
1998-2000
|
6.000
|
Completed & handed over to Government. |
11
|
NHA- Loralai to Lor Ali. |
1998-2000
|
4.000
|
Completed & handed over to Government. |
12
|
Killa Saifullah – Badini Road. |
1998-2000
|
4.000
|
Completed & handed over to Government. |
13
|
Kingri – Chaptuk – Baghao Road. |
1998-2000
|
4.000
|
Completed & handed over to Government. |
14
|
Murgha Kibzai – Musakhail Road. |
1998-2000
|
2.909
|
Completed & handed over to Government. |
15
|
Murgha Kibzai – Mekhtar Road. |
1998-2000
|
2.800
|
Completed & handed over to Government. |
16
|
Drug – Taunsa Road. |
1998-2000
|
2.800
|
Completed & handed over to Government. |
17
|
Zhob – Mir Alikhail Road. |
1998-2000
|
2.300
|
Completed & handed over to Government. |
18
|
NHA- Loralai to Barad Road. |
1998-2000
|
2.800
|
Completed & handed over to Government. |
Livestock
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
1
|
Sheep & Goat production through Range – Land Development Project. Loralai. |
1987
|
01.55
|
Handed over to Livestock Department. |
2
|
Establishment of Lamb Fattening Centre. |
1987
|
04.08
|
Scheme transferred to Livestock Department. |
Agriculture Engineering
S.No
|
Name of Scheme |
Year of Completion
|
Cost
|
Remarks |
1
|
Open Surface well and Provision of Engine on the Land of Nawab Khan S/o Durvash Thana Toisir Musakhail. |
2006
|
4.985
|
Nearing completion. |
Roads/Mining Sector
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Construction/ Black Topping Road in Chromite Mining Area, Qilla Saifullah Length 46.5 KM(B/T) 35 Km (Shingle) PSDP No.40 |
403.460
|
282.00
|
30.000
|
87%
|
100%
|
|
2
|
Construction/ B/T of Jungle Abdul Rehman Road, Duki, District Loralai Length 9 Km alongwith bridge PSDP No.41. |
86.637
|
50.623
|
8.000
|
100%
|
100%
|
Bridge
|
3
|
Const: of Road from Margat Levies Check Post to Marwar Top Peer Ismail, District Quetta Length 26 Km, PSDP No.42. |
483.674
|
155.000
|
30.000
|
52%
|
100%
|
2.5 Km Black Topped
|
Building Sector
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Construction of Circuit House at Zhob Town, District Zhob PSDP No.975. |
30.648
|
13.000
|
5.474
|
100%
|
100%
|
Completed |
2
|
Construction of New Block for Finance Department Quetta. PSDP. No.842. |
52.000
|
6.000
|
5.000
|
25%
|
100%
|
Purification plant complete installed roof slab (Pine Line etc) Architecture office complete to roof slab and other final work in progress |
Groundwater Sector
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
PITAB Valley Development Project, Qilla Saifullah 160 Tube wells PSDP No.777. |
309.684
|
237.684
|
38.000
|
67%
|
100%
|
|
Education Sector
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Construction of Boundary Wall for schools in Kech PSDP No.1039. |
24.352
|
14.000
|
10.000
|
37%
|
100%
|
Boundary wall of 10schools are completed Remaining in progress. |
Social Welfare
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Construction of Community Hall at Kalag Kulanch Tehsil Pasni District Gwadar PSDP No.752. |
5.170
|
5.170
|
3.670
|
85%
|
100%
|
77 % completed. |
2
|
Construction of Community Hall at Kalmat Pasni PSDP No.753. |
5.170
|
5.170
|
4.170
|
100%
|
100%
|
Completed. |
3
|
Construction of Community Hall at Pushkaan, District Gwadar PSDP No.754. |
5.170
|
5.170
|
4.170
|
100%
|
100%
|
Completed. |
Sports
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Const: of Culture Center at Ormara, Gwadar PSDP No.66. |
6.217
|
6.217
|
5.717
|
85%
|
100%
|
Main Structure work in Progress. |
Health Sector
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Establishment of RHC at Gomazai Tehsil Tump District Kech. PSDP No.835. |
9.690
|
9.690
|
5.690
|
60%
|
100%
|
Up to foundation level completed. |
2
|
R.H.C. Pidrak Kech PSDP No.836. |
7.972
|
7.972
|
0.972
|
95%
|
100%
|
Up to foundation level completed. |
3
|
R.H.C. Kalatuk Gwadar PSDP No.837. |
9.690
|
9.690
|
2.690
|
100%
|
100%
|
Completed. |
Industrial Sector
S.No
|
Name of Projects |
Approved Cost
(in million) |
Expenditure 30.6.2007
|
Allocation 2007- 08
|
Physical Progress %
|
Financial Progress %
|
Progress |
1
|
Establishment of Fish Processing Plant at Pasni. District Gwadar PSDP No.838. |
177.512
|
50.000
|
20.000
|
40%
|
100%
|
75 % machinery delivered at site Building work in progress. |
ROAD SECTOR
Name of Projects |
Total Cost
( In Million ) |
Const:/Black Topping of Road from Yaroo Shaher to Killi Gandari (Duki) Road, Loralai (Length 24 Km). |
121.030
|
Const: of Main Hanna Urak Road, District Quetta (Length 12 Km). |
29.439
|
Const: of Roads Panjpai & Aghrab Area, District Quetta (Length 20 Km). |
59.340
|
Const: of Roads in Hazar Ganji, District Quetta (Length 21 Km). |
48.774
|
B/T of Chashma Achozai & Surrouding Road, District Quetta (Length 8 Km ). |
17.267
|
Const: Black Topping of Turbat Pasni Road upto Gowarkope Cross Phase-I, Length 44 Km. |
434.223
|
Const: of Toda Safarzai Road, Qilla Saifullah (Length 77 Km ) 56 Km B/T. |
389.730
|
Const: of Killa Saifullah and Muslim Bagh Town Road, Killah Saifullah (Length 91 Km). |
379.722
|
Extension of Gawak Radeeg Road, Turbat (Length 15 Km). |
133.601
|
Const:/Black Topping of Alandoor to Nawano District Kech (Length 44 Km ). |
177.491
|
Improvement City Roads Sewerage System, Parks etc. in District Zhob. |
60.000
|
Extension of Mirabad to Rodbun Road, District Kech Length 25 Km. |
72.587
|
Construction of Black Top Road from Gawarg Bagh to Kapkafar, District Kech (Length 15 Km). |
67.902
|
TOTAL
|
2005.394
|
BUILDINGS / COMMUNITY HALLS
Name of Projects |
Cost Approved
( In Million ) |
Construction of Community Hall at Kalmat Pasni. |
5.170
|
Construction of Community Hall at Pushkaan, District Gwadar. |
5.170
|
Rural Health Center Kalatuk District Gwadar. |
9.690
|
Construction of Circuit House Zhob. |
30.648
|
Kech Valley Development (Road + Installation of Wind Mills+ Sewerage System + Wells for Agricultrue). |
163.650
|
TOTAL
|
214.328
|
BRIDGES
Name of Projects |
Cost Approved
( In Million ) |
Construction Bridge of Jungle Abdul Rehman Road, Duki, District Loralai (Length 9 Km). |
86.637
|
Construction of Zangiwal Bridge, Loralai. |
75.475
|
TOTAL
|
162.112
|
INDUSTRY
Name of Projects |
Cost Approved
( In Million ) |
Cotton Ginning Factory at Uthal District Lasbella. |
41.228
|
Establishment of Mining cutting Marble & other stone unit at Hub District Lasbella. |
177.411
|
TOTAL
|
218.639
|
Roads |
79 Projects
|
Total Length |
3703.65 Km
|
Earth Work Completed |
990 Km
|
Sub Base Completed |
650 Km
|
Base Course Completed |
650 Km
|
Total Black Topped |
599.50 Km
|
Mining Shingle Road |
35 Km
|
Buildings |
02 Nos.
|
Community Halls |
02 Nos.
|
Bridges |
02 Nos.
|
Industries |
FUTURE PLANNING
INDUSTRIES |
Total Cost
( In Million ) |
Establishment of Cement Factory at Gwadar. |
13354.00
|
Chromite Benefication plant at Muslim Bagh District Killa Saifullah (NEW SCHEME) |
100.00
|
Caster Oil and Other Chemical Manufaction Unit at Winder District Lasbela. |
200.00
|
Apple Processing Plant at Quetta. |
113.250
|
GROUND WATER SECTOR
Total Cost
( In Million ) |
|
Jhal Gao District Area (100 TUBEWELLS). |
200.00
|
Hamayun Lora (25 TUBEWELLS). |
50.00
|
Dast River (20 TUBEWELLS). |
40.00
|
Katch River (20 TUBEWELLS). |
40.00
|
Injeera Zehri (20 TUBEWELLS). |
40.00
|
Mashkial (20 TUBEWELLS). |
40.00
|
Sarai-Paroom-Panjiri Rakhshan (50 TUBEWELLS). |
100.00
|
Nal Grashia (25 TUBEWELLS). |
50.00
|
Rehabilitation and Installation of new Tubewells in Bella District (55 TUBEWELLS). | |
Dudar Kanraj Valley (15 TUBEWELLS) |
150.00
|
LIVESTOCK
Total Cost
( In Million ) |
|
DAIRY FARMING. |
20.00
|
CATTLE BREADING. |
20.00
|
GENERAL
Total Cost
( In Million ) |
|
Strengthening of Civil Work Division of BDA- import of road making machinery. |
965.00
|
Strengthening OF GROUND WATER DIVISION OF BDA – import of drilling rigs. |
2381.00
|
Ferry Services at Balochistan Coast. |
1,000.00
|
Establishment of Sonmiani Port District Lasbella. |
500.00
|
Tourist Resort at Gaddani. |
500.00
|
Corporate Farming in Lasbella, Awaran, and Kharan Districts. |
200.00
|
ROAD SECTOR (DISTRICT KECH)
Total Cost
( In Million ) |
|
ZARIN BUG TO ROD SAR 20 KM, DASHT. |
60.00
|
MAIN ROAD TO BALEEN BAZAR, 20 KM, TURBAT GWADAR. |
6.00
|
MAIN ROAD TO DADAY, 15 KM. |
45.00
|
MAIN ROAD TO KARKIK, DASHT, 25 KM. |
75.00
|
U.C. ZARIN BUG, 20 KM. |
60.00
|
GOBURD TO MULLACHAT, 15 KM. |
45.00
|
CONSTRUCTION OF ROADS IN MINNING AREAS IN DIFFERENT DISTRICTS FOR DEVELOPMENT OF MINES. |
2,500.00
|